SEPTEMBER,
2003 PLANNING COMMISSION MINUTES:
September 23, 2003
September 30, 2003
SEPTEMBER 23, 2003
1. CALL TO ORDER AND ROLL CALL: Commissioners Cutter, Meatzie and Uhl were
present. At 6:45 p.m., due to the lack of a quorum, the meeting was adjourned.
Staff was instructed to ascertain the availability of members and reschedule for
Tuesday, September 30, 2003 if possible.
Respectfully submitted,
Reda A. Quinlan
City Clerk
APPROVED by the Planning Commission this 28th day of October, 2003.
SIGNED by the Chair this 28th day of October, 2003.
Samuel Balen, Chair
SEPTEMBER 30, 2003
1. CALL TO ORDER AND ROLL CALL: Chair Balen called the meeting to order at
6:33 p.m. Commissioners Milligan, Meatzie, Balen and Cutter answered the roll.
Commissioners Hauser, Uhl and Cvar were absent. A quorum was present.
2. CITIZEN COMMENTS AND CONCERNS: Chair Balen noted that Ms. Booth's letter of
concern about the stormwater runoff was a more broad concern than just the
Dane's application. Ms. Booth noted that the lots were being covered by
buildings and was concerned that drainage from pipes and rooftops erode away the
bank in front of the properties on Yaquina John Point. Chair Balen noted that in
Yaquina John Point and Alsea Highlands there is no curb and gutter system, so
stormwater tends to be a problem in areas such as these. He felt the Planning
Commission should look at the development code and ensure that appropriate rules
and regulations be included if they aren't already. Mr. Dane noted that there
was far less water running down on the beach now than there was when they first
bought the property in 1968. According to Mr. Dane, In 1974 a ditch system was
installed to divert the water from the east side of Waziyata and into a culvert
down the trail to the beach. The sanitary district also improved the situation,
as the septic tanks and pits used to discharge over the bank as well. Mr. Dane
agreed that this was still an issue though, as people increase the roof coverage
and sizes of the houses. Chair Balen felt that the Yaquina John Point area
should be reviewed to determine if future development should even be allowed to
happen. He noted that fire is also a major concern, as the houses are so close
together. The drainage issue will be put on an upcoming agenda to be addressed
through Code review and revisions.
Dick Mevis, property caretaker for Mrs.
Booth, noted that when the riprap had originally been installed in front of her
property, there was one space of about 4-5 feet of sand. That is now 50 feet in
width, and a major portion of the bank is gone. He advocated that roof drains be
installed to preserve the bank from further erosion.
3. COMMISSION COMMENTS AND CONCERNS: Commissioner Milligan noted that coastal
erosion had been dramatically increased in the last several decades, and this is
a risk in waterfront property. She felt that issues such as riprap should be
undertaken by those property owners, but erosion is always a risk when
purchasing waterfront property. Mr. Lewis noted that in regard to the abandoned
car on Spring Street, the Sheriff’s office has again been apprised, so
hopefully some action will be forthcoming. Commissioner Cutter mentioned that it
appeared the City was clearing the area up around the skatepark. Staff informed
the Commission of the City’s plans to widen Crestline to allow for a
pedestrian/bicycle path, and also that the skatepark parking lot is scheduled to
be paved. Commissioner Cutter expressed concern that residents along Crestline
may utilize the newly paved shoulder for parking, which may cause additional
problems for pedestrians and bicyclists.
4. MINUTES: The Commission considered the minutes from the August 26, 2003
meeting. Commissioner Meatzie moved to approve the minutes as presented.
Commissioner Cutter seconded, and the motion carried unanimously
on a voice vote.
5. CORRESPONDENCE: None, other than Mrs. Booth's letter which had already been
discussed, or that was associated with the hearing.
6. PUBLIC HEARING: 1-V-03: Louise and Charles Dane Application for Establishing
Property Lines: Chair Balen opened the Public Hearing, and called for bias,
conflicts of interest and ex parte contact. Commissioner Meatzie stated
that, due to prior dealings with the applicant, he felt he would not be able to
render an unbiased opinion. Following a brief recess, staff returned with a
suggestion that with only four members present, and one recused, the Public
Hearing should be delayed to the next regular Planning Commission meeting date,
October 28, 2003. Chair Balen then announced the Public Hearing was postponed,
and reopened the Planning Commission meeting.
7. DISCUSSION/ACTION ITEMS:
A. Planner Report: Mr. Lewis reviewed his written report.
B. Date for Workshop to Discuss Code Revisions: A brief discussion ensued. It
was suggested that the City Council be apprised of the fact that the Planning
Commission was moving forward with the code revisions. Chair Balen noted that
they would also like to look at the issue of stormwater runoff with respect to
properties in the City and how that might best be handled, such as a study of
site drainage. Commissioner Cutter noted that with the holiday season coming up,
the dates in November and December may need to be moved in order to ensure a
quorum. It was determined to begin the process of discussing code revisions at
the meeting in October, and to schedule a workshop on the issue for the 9th
of December. Staff noted it may be possible to make that a dinner workshop, so
the Commission could start early and have plenty of time for discussion.
C. Other Issues: None.
8. ADJOURNMENT: At 7:20 p.m., there being no further business to come before the
Commission, Commissioner Meatzie moved to adjourn. Commissioner Cutter seconded,
and the motion carried unanimously on a voice vote.
Respectfully submitted,
Reda A. Quinlan
City Clerk
APPROVED by the Planning Commission this 28th day of October, 2003.
SIGNED by the Chair this 28th day of October, 2003.
Samuel Balen, Chair
Top of Page
Back to Planning Commission
Minutes
Home